Saturday, April 07, 2007

Luna Moth Shawl

Earlier this week, on my Civil War Shawl group, someone mentioned that she wanted to do this shawl as a KAL. After clicking on the link to a free pattern, I decided that I wanted to do this one, only now! So, on Thursday night, I sat and ripped out a completed shawl that I never have liked very well. (The knitting was great, but it didn't fit the way that I wanted.) Then, last night, I cast on. I really, really don't need another project on the needles, right now, but its coming out so great, and I just love new projects!!
Green Gable is coming along. I have only 2 balls (out of 6) of yarn left to knit. I have a feeling this sweater is going to take nearly all that I purchased. It doesn't look much different than last time, so no picture, yet.

Thursday, April 05, 2007

On the Sewing Front

These past 4 days, I've not been knitting at night, like I usually do. I've been sewing! Its been quite a while since I've done this, but I decided that I would sew an Easter dress for myself. The process has been going very well. I've been taking lots of time, ironing each step as I finish it. The results are great! After 2 nights of sewing for a couple hours each night, I have almost finished! I need to add a second row of trim on the top of the waistband, add 2 rows of trim near the hem, put in the zipper and hem it. I figure that I'll work on it another 2 hours, or so on Saturday and it will be all ready, and just in time, too! Since lavender is one of my favorite colors and it seems to fit really well, I think that this one will become one of my favorite dresses. Now, I just wish that I had time to knit a purple shawl to go with it!

Wednesday, April 04, 2007

Vacation!!!

First, Green Gable news: I have finished the second sleeve and am about to begin the remainder of the body! I'm satisfied that I've completed this milestone.
Meanwhile, my dh & I have been invited, by my parents, to join them on vacation in Coeur D'Alene, Idaho. I'm excitedly planning, now. Mom & I have been talking about what food and entertainment to take with us. I think I will scrapbook with her, while we're away. (We're only going for 3 days and 2 nights, but they are all mid-week, so I'll be off work!) I need to clean out my scrapbook bag, re-organizing it and removing anything that is finished or that I won't be working on while over there. It currently weighs about 80 pounds!
I'm also planning on taking Green Gable to knit on in the car, since dh will drive most of the way. Its about a 6 hour trip, so that equates to plenty of time to knit on it. Hopefully, I'll finish just before we arrive. This way, I won't feel guilty when we go scrapbooking & yarn store hopping and I buy a new project to start. I love to buy yarn at "new" stores. Its one of my favorite things to do while on vacation. I'm probably going to buy yarn that can be used for this month's Bag of the Month. I wasn't very excited about last month's bag, and I only joined at the end of February, so this would be my first project knit with the group. Its a beautiful slip stitch pattern that creates a nice felted bag. Add some lining and a sturdy bottom & its just about perfect!!

Monday, April 02, 2007

Green Gable

I finished Green Gable to the point of removing the sleeve stitches from the needle! I knit about an inch on the body of the sweater, and then went on to finish a sleeve. Since they're short sleeves, it didn't take too long, except I was using a 60" circular needle and the magic loop method. Every time I knit a half round, I would have to stop and pull 60" of the circular through the work! This seemed to take forever, so I really need to put a shorter circular needle on it. (I'm using KnitPicks options needles, so this will be no problem. I just need to remember to grab a shorter cable!) I'm really loving the way that the yarn is knitting up, and so is my mom. She still thinks that the sweater is for me, and, of course, I'm not correcting that mis-belief! I figure that I have it at least half way done. Hopefully, I will get a picture posted this evening or tomorrow.